Highway infrastructure is often a critical element of any proposed new residential construction and these agreements, which are part of the Highways Act of 1980, are used to make modifications to an existing public highway. The need for motorway agreements is often identified in an agreement provided for in point 106 or in the notice of decision as a precondition for pre-work or the profession. The development planning request generally defines the principles of the work required. The motorway authority cannot then refuse to enter into an agreement for the promoter to carry out the authorized work as long as the work complies with the appropriate standards. As a general rule, these legally binding agreements relate to infrastructure projects that allow access to a construction zone, such as roundabouts, marked intersections, right-hand turn lanes, new pedestrian crossings or priority intersections. They can also cover power diversions, drainage systems and public lighting. Although the Council is involved throughout the discussion of the plans and their timing with the developing parties, the final decision is to continue with a program and reach an agreement, that of the developer, and the Commission has no control over it. The package may include highway work that will be carried out under an agreement under Section 278, drainage construction and earthworks. As a one-stop shop for several aspects of infrastructure, we can offer better coordination of work and minimize potential delays. The agreement specifies the requirements of the local road authority and the developer to ensure that the proposed work is carried out in accordance with the approved plans. It also explains how local road authorities can act if the developer is unable to complete the work. The procedure required to reach an agreement can take time and time, and it is therefore desirable to get in touch as soon as possible with the authority of the motorways. We have specific action expertise for owners and developers in sections 278 and 38 and can assist in the drafting, verification and negotiation of these documents.

We know that there can often be time constraints in concluding these agreements, as they have a direct impact on development progress, and we recognize the need for rapid action. If the proposed infrastructure requires routine maintenance, the agreement procedure provides for the guarantee of a re-pending amount for the financing of the work. Conditions for the person to pay all or part of the cost of the work that can be fixed or fixed in accordance with the agreement. When a developer is required to carry out highway work in connection with its development, its development permit requires that it enter into a motorway agreement to carry out the work. A Section 278 (or S278) agreement is a section of Highway 1980 that allows developers to enter into a legal agreement with the Council (as a Highway Authority) to make permanent modifications or improvements to a public highway as part of a plan. Work on the highway can only begin once both have arrived: construction will be defined at the design stage, including the type of crossing required for access to the public highway, as well as the proposed configuration of the interior lanes.

Publié dans Non classé